<%@LANGUAGE="VBSCRIPT" CODEPAGE="1252"%> <% ' *** Logout the current user. MM_Logout = CStr(Request.ServerVariables("URL")) & "?MM_Logoutnow=1" If (CStr(Request("MM_Logoutnow")) = "1") Then Session.Contents.Remove("MM_Username") Session.Contents.Remove("MM_UserAuthorization") MM_logoutRedirectPage = "../index.asp" ' redirect with URL parameters (remove the "MM_Logoutnow" query param). if (MM_logoutRedirectPage = "") Then MM_logoutRedirectPage = CStr(Request.ServerVariables("URL")) If (InStr(1, UC_redirectPage, "?", vbTextCompare) = 0 And Request.QueryString <> "") Then MM_newQS = "?" For Each Item In Request.QueryString If (Item <> "MM_Logoutnow") Then If (Len(MM_newQS) > 1) Then MM_newQS = MM_newQS & "&" MM_newQS = MM_newQS & Item & "=" & Server.URLencode(Request.QueryString(Item)) End If Next if (Len(MM_newQS) > 1) Then MM_logoutRedirectPage = MM_logoutRedirectPage & MM_newQS End If Response.Redirect(MM_logoutRedirectPage) End If %> SAIC Tactical Information Systems Operation

TACTICAL INFORMATION SYSTEMS DIVISION
LOGOUT

ISO 9001-2000 Certified

Products and PricingSearch This SiteServicesContact UsLocationTacinfosys Home Page


Supplier Questionnaire

You will receive a copy of your input via email.

Company
Address:
City
State
Zip
Date
Contact
Phone
Fax
email


ORGANIZATION / ADMINISTRATIVE

Position: Personnel Telephone E-mail
General Manager
Quality Manager
Supplier Personnel: Manufacturing     Quality

INSPECTION AND TESTING DOCUMENTATION
1. Are written inspection and testing instructions clear, complete and current? Yes No N/A
2. Are there criteria for acceptance and rejection of products or services? Yes No N/A


RECORDS
1. Are inspection and test records maintained? Yes No N/A
2. Are there criteria for acceptance and rejection of products or services? Yes No N/A
If inspection and test records are maintained, do the records indicate: Choose one only in each row:
a.
The nature and number of observations made? Yes No N/A    
b.
The number and type of nonconformances found? Yes No N/A    
c.
The quantities accepted and rejected? Yes No N/A    
d.
The nature of corrective action taken as appropriate? Yes No N/A    

CORRECTIVE ACTION
1. Is there a documented Corrective Action system? Yes No N/A
This system should initiate prompt action to correct assignable conditions, thereby rejecting supplies and services which do not conform to specification or purchase order/contract requirements.

DRAWINGS AND CHANGES
1.Does the Supplier's Inspection System have written procedures to document Purchase Order drawings, specifications, and instructions? Yes No N/A

INDICATION OF INSPECTION STATUS
1.Is there a system for documenting the inspection status of supplies and/or services? Yes No N/A

NONCONFORMING MATERIAL
1. Is there a system for controlling nonconforming material? Yes No N/A
2. Are there written procedures for the identification, segregation, presentation and disposition of reworked or repaired supplies? Yes No N/A

CALIBRATION SYSTEM DESCRIPTION
1. Is there a written description of the Calibration System? Yes No N/A
2. Does the Calibration System include: Choose one only in each row:
a.
accuracy requirements or standards? Yes No N/A    
b.
environmental controls? Yes No N/A    
c.
intervals for calibration? Yes No N/A    
d.
calibration procedures? Yes No N/A    
e.
calibration records? Yes No N/A    
f.
calibration status noted on equipment? Yes No N/A    

ESD CONTROL SYSTEM
1. Is there a system in place for handling ESD components equivalent to ANSI/ESD S20.20-1999? Yes No N/A